Login
Trafo Engineering
⚡ Turnaround: 48–72 Hours 🛡️ 18 Months Warranty

Transformer Overhauling

Complete 11kV/33kV Core & Coil Overhaul to BUET Laboratory Standards

Comprehensive turnkey overhauling of distribution and power transformers up to 33kV / 10 MVA. Includes full coil rewinding, high-vacuum dehydration, de-sludging, gasket renewal, and factory acceptance testing.

Transformer Overhauling
Trafo Heavy Engineering Workshop ISO 9001:2015 & IEC Certified Testing Facilities

Key Deliverables & Specifications

99.99% Electrolytic Copper Windings

Double paper-covered oxygen-free copper with Class H Nomex insulation.

High-Vacuum Thermal Dehydration

Baking active core in vacuum oven to strip moisture down to < 10 ppm.

Complete Nitrile Cork Gasket Renewal

100% replacement of all tank, bushing, and valve gaskets with oil-resistant nitrile.

BUET Laboratory FAT Testing

Complete FAT inspection certificate compliant with IEC 60076 standards.

Engineering Scope & Capabilities

Turnkey Substation Transformer Overhauling

Trafo Engineering provides complete on-site and workshop overhauling services for oil-immersed and dry-type transformers across Bangladesh. Our ISO-certified facility in Dhaka is equipped with precision coil winding machinery, high-vacuum drying chambers, and comprehensive dielectric test benches.

Why Overhauling is Critical for Industrial Transformers

Over years of continuous operation, transformer oil degrades, moisture penetrates kraft paper insulation, and thermal cycles cause core clamping bolts to loosen. Periodic comprehensive overhauling prevents catastrophic explosive failures, restores original efficiency, and extends asset lifespan by 15 to 20 years.

Our In-House Overhauling Facilities

  • 15-Ton Overhead Crane Bay: Safe lifting and de-tanking of active core assemblies up to 10 MVA.
  • High-Vacuum Thermal Drying Chamber: Dehydration of active core insulation to < 10 ppm moisture content at 105°C.
  • Automated Copper Winding Machines: Precision layer-wound and disc-wound coils using 99.99% pure electrolytic copper.
  • BUET Stamped FAT Test Bench: Ratio, polarity, vector group, winding resistance, and 80kV dielectric breakdown testing.

Step-by-Step Engineering Methodology

1

On-Site Diagnostic & Oil Sampling

Secondary injection, insulation resistance (Megger), and dissolved gas analysis (DGA).

2

De-Tanking & High-Pressure Core Washing

Lifting active core assembly, chemical neutralisation, and removal of acidic sludge.

3

Precision Coil Rewinding & Vacuum Baking

Rewinding damaged limbs, insulation layering, and 24-hour vacuum thermal dehydration.

4

Re-Tanking, Oil Re-Filling & Final FAT

Vacuum oil filling under negative pressure, seal testing, and comprehensive FAT tests.

Diagnostic & Calibration Instruments

Testing Instrument / Apparatus Capability & Standard Compliance
High-Vacuum Oil Plant 6,000 LPH Double-Stage Degasser (IEC 60296)
5kV Digital Megger Megger MIT515 Diagnostic Tester (IEEE C57.12.90)
Turns Ratio Meter (TTR) 3-Phase Precision Transformer Ratio Analyzer
Micro-Ohm Contact Meter 100A Winding Resistance Analyzer

Frequently Asked Technical Questions

Standard workshop overhauling takes 48 to 72 hours. For emergency industrial shutdowns, we offer 24-hour expedited overhauling with round-the-clock engineering shifts.
Yes, Trafo Engineering maintains a standby inventory of distribution transformers (250kVA–1500kVA) available for temporary rental to keep your factory running without downtime.
We offer an 18-Month Comprehensive Performance Warranty on all rewound coils, insulation materials, and seal integrity.
⚡ Fast Response Guarantee

Book Transformer Overhauling

Get an on-site engineer dispatched or receive a formal branded quotation.

Direct Engineer Line +880 1700-000000

Available 24 hours a day for factory power outages and emergency substation repairs.

HOME PRODUCTS
QUOTE
CART